Our Remodeling Process
Every transformation follows our proven process. Click any phase to see detailed steps.

Phase 1: Design & Planning
In-Home Assessment
Layout & Design

Phase 2: Demolition & Site Prep
Home Protection Setup
Full Demolition

Phase 3: Plumbing & Waterproofing
Plumbing Rough-In
Cement Board Installation

Phase 4: Tile & Flooring
Shower Floor Tile
Shower Wall Tile

Phase 5: Vanity, Fixtures & Glass
Vanity Installation
Shower & Tub Fixtures

Phase 6: Final Details & Cleanup
Paint & Caulking
Final Walkthrough
Week-by-Week Overview
A simplified view of what to expect each week of your remodel
Week 1
Planning & Demolition
- Final design and material approval
- Protection setup and demolition
- Plumbing rough-in and inspection
- Cement board and waterproofing
Week 2
Tile & Flooring
- Shower floor and wall tile
- Bathroom floor installation
- Grouting and sealing
- Niche and detail tile work
Week 3
Fixtures & Finishes
- Vanity and countertop installation
- Shower and tub fixtures
- Frameless glass enclosure
- Mirror, lighting, and accessories
Week 3–4
Final Details
- Paint and caulking
- Final adjustments and touch-ups
- Deep clean
- Client walkthrough and completion
Popular Upgrades & Add-Ons
Enhance your space with these common upgrade options
Luxury Features
- Heated floor system (electric radiant in-slab)
- Freestanding soaking tub
- Body spray shower system with multiple heads
- Steam generator for a full steam shower experience
Functional Upgrades
- Built-in tile shower niche (no more caddies)
- Frameless glass enclosure upgrade
- Double vanity conversion
- Towel warming bar
Smart & Modern Features
- LED backlit mirror with anti-fog and dimming
- Motion sensor exhaust fan
- Programmable thermostatic shower system
- USB charging outlets in vanity area
Accessibility Modifications
- Curbless walk-in shower (zero threshold)
- Grab bars integrated into tile design
- Comfort-height toilet installation
- Wider doorway for easier access
- Slip-resistant floor tile selection
Important Considerations
What you need to know before starting your project
Bathroom Unavailable During Remodel
Your bathroom will be out of service for most of the project — typically 2–3 weeks for a full remodel. If this is your only bathroom, we'll discuss scheduling options and priority sequencing to minimize the impact on your daily routine.
Hidden Conditions Found During Demo
Behind the walls of older bathrooms, we often find issues — rotted subfloor, failed waterproofing, outdated plumbing, or mold. When we find something, we document it, show you, and discuss how to address it. Taking care of it now prevents much larger problems later.
All Selections Must Be Final Before Demo
Tile, vanity, fixtures, and all materials must be selected and ordered before demolition starts. Changes after work begins can cause delays, added costs, and in some cases require re-doing completed work. We help you finalize everything upfront.
Cure Times Cannot Be Rushed
Tile adhesive must fully cure before grouting, and grout must cure before sealing and use. These aren't arbitrary wait times — they're required for the materials to perform correctly long-term. We build them into the schedule from day one.
Premium Stone CountertopsIn-House Fabrication
We fabricate our own countertops at Deluxe Art Stone, giving you access to premium slabs of granite, quartz, and exotic stones - all with faster turnaround and better pricing. Our in-house fabrication means better quality control, faster installation, and seamless coordination.