Bathroom Remodeling
Done Right, From Start to Finish

Bathroom Remodeling20-day master bath | 12-day powder room

Whether you're updating a guest bath or overhauling your master suite, we handle every detail — tile, plumbing, fixtures, and finishes — so you end up with a bathroom you'll actually love.

2–4 Weeks
Typical Timeline
6 Phases
Detailed Process
100%
Satisfaction Guaranteed
Licensed
Local & Insured

Our Remodeling Process

Every transformation follows our proven process. Click any phase to see detailed steps.

Phase 1: Design & Planning
1
5–7 days

Phase 1: Design & Planning

4 key steps

In-Home Assessment

Layout & Design

+2 more steps
Phase 2: Demolition & Site Prep
2
1–2 days

Phase 2: Demolition & Site Prep

3 key steps

Home Protection Setup

Full Demolition

+1 more steps
Phase 3: Plumbing & Waterproofing
3
2–3 days

Phase 3: Plumbing & Waterproofing

3 key steps

Plumbing Rough-In

Cement Board Installation

+1 more steps
Phase 4: Tile & Flooring
4
3–5 days

Phase 4: Tile & Flooring

4 key steps

Shower Floor Tile

Shower Wall Tile

+2 more steps
Phase 5: Vanity, Fixtures & Glass
5
2–3 days

Phase 5: Vanity, Fixtures & Glass

4 key steps

Vanity Installation

Shower & Tub Fixtures

+2 more steps
Phase 6: Final Details & Cleanup
6
1 day

Phase 6: Final Details & Cleanup

3 key steps

Paint & Caulking

Final Walkthrough

+1 more steps

Week-by-Week Overview

A simplified view of what to expect each week of your remodel

1

Week 1

Planning & Demolition

  • Final design and material approval
  • Protection setup and demolition
  • Plumbing rough-in and inspection
  • Cement board and waterproofing
2

Week 2

Tile & Flooring

  • Shower floor and wall tile
  • Bathroom floor installation
  • Grouting and sealing
  • Niche and detail tile work
3

Week 3

Fixtures & Finishes

  • Vanity and countertop installation
  • Shower and tub fixtures
  • Frameless glass enclosure
  • Mirror, lighting, and accessories
4

Week 3–4

Final Details

  • Paint and caulking
  • Final adjustments and touch-ups
  • Deep clean
  • Client walkthrough and completion

Popular Upgrades & Add-Ons

Enhance your space with these common upgrade options

Luxury Features

  • Heated floor system (electric radiant in-slab)
  • Freestanding soaking tub
  • Body spray shower system with multiple heads
  • Steam generator for a full steam shower experience

Functional Upgrades

  • Built-in tile shower niche (no more caddies)
  • Frameless glass enclosure upgrade
  • Double vanity conversion
  • Towel warming bar

Smart & Modern Features

  • LED backlit mirror with anti-fog and dimming
  • Motion sensor exhaust fan
  • Programmable thermostatic shower system
  • USB charging outlets in vanity area

Accessibility Modifications

  • Curbless walk-in shower (zero threshold)
  • Grab bars integrated into tile design
  • Comfort-height toilet installation
  • Wider doorway for easier access
  • Slip-resistant floor tile selection

Important Considerations

What you need to know before starting your project

Bathroom Unavailable During Remodel

Your bathroom will be out of service for most of the project — typically 2–3 weeks for a full remodel. If this is your only bathroom, we'll discuss scheduling options and priority sequencing to minimize the impact on your daily routine.

Hidden Conditions Found During Demo

Behind the walls of older bathrooms, we often find issues — rotted subfloor, failed waterproofing, outdated plumbing, or mold. When we find something, we document it, show you, and discuss how to address it. Taking care of it now prevents much larger problems later.

All Selections Must Be Final Before Demo

Tile, vanity, fixtures, and all materials must be selected and ordered before demolition starts. Changes after work begins can cause delays, added costs, and in some cases require re-doing completed work. We help you finalize everything upfront.

Cure Times Cannot Be Rushed

Tile adhesive must fully cure before grouting, and grout must cure before sealing and use. These aren't arbitrary wait times — they're required for the materials to perform correctly long-term. We build them into the schedule from day one.

INTEGRATED SERVICES

Premium Stone CountertopsIn-House Fabrication

We fabricate our own countertops at Deluxe Art Stone, giving you access to premium slabs of granite, quartz, and exotic stones - all with faster turnaround and better pricing. Our in-house fabrication means better quality control, faster installation, and seamless coordination.

START YOUR TRANSFORMATION

Ready to Transform Your Space?

Get your free consultation and detailed estimate today. We'll walk you through every phase, answer all your questions, and create a custom plan.